AccessMyLibrary provides FREE access to over 30 million articles from top publications available through your library.
Create a link to this page
Copy and paste this link tag into your Web page or blog:
In my work as an aquatics consultant, I cannot even count the number of times I've heard the owner or operator of a recently constructed aquatics facility start a sentence like this: "I wish ..."
"I wish we would have hired someone to review the plans."
"I wish we would have spotted those design errors."
"I wish we would have thought about everything more before we started building."
I usually hear these regrets uttered while doing a post-construction audit for an organization that is not happy with its new facility. Something is wrong. The punch list keeps growing. Architects, engineers, suppliers and various members of the design ...