Continuos improvement on the shop floor: lessons from small to midsize firms.

Business Horizons

| November 01, 1997 | Choi, Thomas Y.; Rungtusanatham, Manus; Kim, Ji-Sung | COPYRIGHT 1989 JAI Press, Inc. (Hide copyright information)Copyright

CI may not be as fashionable as, say, reengineering. But it is a low-cost way to improve quality and productivity, once you get past the six critical milestones.

The last two decades have witnessed waves of popular prescriptions preaching organizational change for the betterment and, ultimately, the survival of companies. Hearing these siren voices, businesses have plunged headlong down the paths of reengineering, restructuring, and downsizing. According to the CSC Index and Dataquest Europe, about 70 percent of the top 600 European and American firms had implemented at least one reengineering initiative as of 1994.

In the midst of this frenzy of drastic transformations, however, the proponents of quality management have stood firm in reminding both scholars and practitioners of the importance and necessity of making incremental and continuous changes that can accumulate and have a large and lasting impact on an organization.

Adding credence to this message is the negative publicity associated with reengineering and downsizing projects. At least seven out of ten programs fail to achieve their goals, whereas fewer than one in three companies increase profits as much as expected. Mutual Benefit Life, an early hero of the reengineering movement, later went bankrupt, costing its policy holders dearly.

In contrast, encouraging news has been reported about continuous improvement (CI) changes. Industry Week identified ten winners of the "America's Best Plant" survey and reported on their CI practices. One winner, Wainwright Industry, had reduced waste and increased quality and productivity, not in one large swoop, but over a period of five years. It also decreased manufacturing costs by more than 20 percent over six years. Another winner, U.S. Steel, cut its in-plant reject rates, cycle times, and work-in-process inventory in two to three years' time.

CI requires, a priori, the involvement of rank-and-file workers who take the lead in creating a dynamic work environment on the shop floor, where physical values are born. It involves all members of the organization working as a collective intelligence and, as Schroeder and Robinson (1991) put it, "unleash[ing] employee experience and creativity to improve both products and processes." Kiyoshi Suzaki, author of The New Manufacturing Challenge (1987), asserts that CI is "a kind of meditation technique that reveals its profundity only through ceaseless repetition" and change (Poe 1991). Deming (1986) also advocated the importance of continuous and incremental repetition of the plan-do-check-act (PDCA) cycles.

Manufacturing plants attempting to initiate continuous improvement programs (CIPs) typically face six milestones. Culled from the experiences of seven small and medium-sized plants in implementing a CIP on the shop floor, these milestones represent critical decision points whose outcomes have the potential to either foster or sink CIP efforts. The seven firms were attracted to CI because although they were interested in working toward lean manufacturing, they realized the financial as well as operational difficulties of such a move. So they joined a CI users group (CIUG) in the fall of 1990, which met every six weeks at one of the seven plants on a rotating basis, and tried to implement suggested changes during the time between meetings. Information from these seven plants were collected and analyzed over a period of a year.

The names of the seven companies have been changed to ensure anonymity and to describe specific characteristics of each:

* "Progressive Engineering and Manufacturing," a maker of springs and small brackets, was given this name because it is the most progressive and advanced of the firms.

* The workers at "Sunshine …

Related articles from newspapers, magazines, journals, and more
Classification of JIT techniques and their implications. (just in time)...
Magazine article from: Industrial Engineering Kupanhy, Lumbidi February 1, 1995 700+ words
Hydraulic Shears are offered with touchscreen interface.(Shear Magic -...
Magazine article from: Product News Network March 8, 2005 700+ words
Indexing System features wireless upload and download.(Hardinge's Indexing...
Magazine article from: Product News Network February 24, 2005 700+ words
©2013 Gale, a part of Cengage Learning. All rights reserved. Contact us | Privacy policy | Terms and conditions

The AccessMyLibrary advertising network includes: womensforum.com GlamFamily