AccessMyLibrary provides FREE access to over 30 million articles from top publications available through your library.

Meeting the army's equipping challenge.(contemporary issues)(Conference news)

Air Force Journal of Logistics

| December 22, 2007 | Campbell, Jim | COPYRIGHT 2007 U.S. Air Force, Logistics Management Agency. This material is published under license from the publisher through the Gale Group, Farmington Hills, Michigan.  All inquiries regarding rights should be directed to the Gale Group. (Hide copyright information)Copyright

Introduction

Today's Army faces different challenges than it did in previous years. Given the Army's high operating tempo (OPTEMPO), its transformation tomodular design, and potential contingency requirements, the Army must ask itself if it is ready to meet its equipping goals for today and for the future. This article explores the United States Army's current equipping strategy, and suggests the modifications needed to help create conditions and metrics to assess current equipment requirements as well as requirements for the future. First, it would be beneficial for the Army to modify readiness assessments of equipment required for mission accomplishment, and to develop metrics that more accurately reflect actual mission essential needs (including unit status report [USR] methodology). Second, a modified program similar to the Army Prepositioned Stock (APS) program is needed that is capable of rotational operations to facilitate the use of prepositioned equipment in current and future contingency operations. Finally, increased budgetary allocations specifically tied to achieving equipping strategies with improved acquisition programs and increased efficiency of the US industrial base will potentially increase the amount of military specific equipment available for use by soldiers. Alone, these measures will have a minor impact on the current situation, but taken collectively they provide a potential solution to overcome the current equipping dilemma facing the Army.

The recently adopted Army Force Generation (ARFORGEN) model combines equipment transfers, new production, and a validated reduction of modified table of equipment (MTOE) authorizations to meet readiness and mission requirements. The Army is not meeting its equipping requirements with new equipment production or procurement. Therefore, a large percentage of equipment is being transferred between units as they cycle through deployment windows. This equipment shuffle strategy does not equal sustained readiness. Stripping units of MTOE equipment during deployments to fill shortages in another unit merely delays fixing the problem. It does not leave commanders or soldiers with the confidence that they will have equipment upon redeployment to train and improve unit readiness for the next mission. Likewise, a reduction of authorized equipment should not be the optimal solution. An arbitrary percentage of fill does not provide equipment critical for readiness, and further diminishes a commander's confidence that he will get the fight equipment in sufficient quantities required for training or mission accomplishment. Nevertheless, these initiatives may be the only way the Army can continue this period of high OPTEMPO until more funding and quicker procurement capabilities are available.

We need to change the way the Army approaches readiness. A focused effort to determine unit requirements; specifically, what is needed to achieve readiness and training for contingency operations and deployments is the first step in this process. Army MTOEs are designed to provide the equipment and personnel required to accomplish a broad scope of assigned missions. These authorization documents are focused on large scale operations conducted continuously over a 24-hour period. They include the operational, logistical and administrative tools necessary to sustain full scale combat operations. While absolutely essential for forced entry and initial combat operations, they may not be appropriate for other types of missions, such as humanitarian, peace enforcement, other types of stability operations and the current rotational environment to support the Global War on Terror (GWOT) in Southwest Asia. Taking a new approach in determining what a unit requires to train and prepare for the most likely deployment scenarios will allow the Army to reallocate equipment and achieve efficiencies without taking risk in operational capability and readiness.

[ILLUSTRATION OMITTED]

Related articles from newspapers, magazines, journals, and more
Anteon Awarded $30M Contract to Support U.S. Army Signal Operations In...
Press release article from: PR Newswire September 23, 2003 700+ words
...Technology Command/9th Army Signal Command's 160th...signal operations throughout Southwest Asia. Joseph M. Kampf, Anteon...sustaining base operations of the Army's 160th Signal Brigade in Southwest Asia." About Anteon Anteon...
ManTech Wins Up to $355M Two-Year Army Contract to Support MRAPs in Southwest...
Press release article from: Business Wire February 3, 2009 700+ words
...contract from the U.S. Army Program Executive Office...acting on behalf of the U.S. Army. ManTech will provide maintenance...on operational tempo in the Southwest Asia region. "ManTech has been...mine protected systems in Southwest Asia since 2003," said Robert...
MTMC provides loading expertise to Bulgarian Army shipment bound for Southwest...
Magazine article from: Translog Koulouvaris, Christopher September 22, 2003 700+ words
...to the American military in Southwest Asia got a helping hand from the...assistance to the Bulgarian Army loading equipment on a Roll...recent years of the Bulgarian Army overseas. The loading took...the discharge, the Bulgarian Army was responsible for the transportation...
ManTech Wins Estimated $114M U.S. Army Contract to Support Counter...
Press release article from: Business Wire March 24, 2006 700+ words
...Freedom and Operation Iraqi Freedom in the Southwest Asia region. This assignment was given to...role as a subcontractor to CSC under the Army Communications-Electronic Life Cycle...enhancement. "ManTech supports the U.S. Army's communications, electronics and logistics...
VSE Supports U.S. Army in Southwest Asia.
Press release article from: PR Newswire January 3, 2006 700+ words
...ManTech") , have been awarded a contract task order to provide maintenance and logistics services in support of U.S. Army equipment in Iraq and Afghanistan. The new competitively awarded contract task order has a base year valued at approximately...
SDDC Southwest Asia forms to run theater moves.(Surface Deployment and...
Magazine article from: Translog Ramian, Randall June 22, 2004 700+ words
...unit assumed the Southwest Asia responsibilities...duty Soldiers and Army Reservists--has...designation, SDDC Southwest Asia, reflects the fact...active duty and Army Reserve soldiers...Department of the Army civilians, civilian...the 599th. SDDC Southwest Asia ...
Road trip: SDDC Southwest Asia works up front at Iraqi port of Umm...
Magazine article from: Translog Ramian, Randall September 22, 2004 700+ words
...SDDC members of SDDC Southwest Asia who recently visited...fellow member of SDDC Southwest Asia. Rickard, a Reservist...conscripted in the Iraqi Army for seven years...Harvey, commander, SDDC Southwest Asia. "To get the port...
CH2M HILL Joint Venture Selected for Work in Iraq and Other Areas of Southwest...
Press release article from: Business Wire January 14, 2004 700+ words
...January 13, the U.S. Army Corps of Engineers...within Central Command's Southwest Asia area of responsibility...to support the U.S. Army Corps of Engineers and...infrastructure needs in Southwest Asia, fits perfectly with...
For more facts and information, see all results
©2009 Gale, a part of Cengage Learning. All rights reserved.
About us | FAQs | Contact us | Privacy policy | Terms and conditions
Other Gale sites: Encyclopedia.com | HighBeam Research | Acquire Content | Books & Authors | Goliath | MovieRetriever | Smart QandA