AccessMyLibrary provides FREE access to over 30 million articles from top publications available through your library.
Create a link to this page
Copy and paste this link tag into your Web page or blog:
The Port of Blyth needed a modern, flexible building solution to reflect its growing status as a major port - and needed it fast in line with the growing status of Battleship Wharf. After considering various options, the port selected a package from SGB Rovacabin that offered value, quality, delivery, future adaptability and technical back-up.
Replacing and expanding the original admin building and staff facilities was part of a #7.8m upgrade of Blyth's main bulk terminal. The Rovacabin units are high-spec, steel-framed building sections, typically 3m x 8.4m, that can be linked horizontally or stacked up to three high. The need here was for a double-storey facility …
Source: HighBeam Research, BUILDINGS & MAITNENANCE: Flexibility boosts Blyth's spirit.