AccessMyLibrary provides FREE access to over 30 million articles from top publications available through your library.
Create a link to this page
Copy and paste this link tag into your Web page or blog:
(From Gulf Construction)
THE Elevator Division of Ahmadiah Trading and Contracting has supplied and installed 10 elevators and eight escalators from Hitachi for the prestigious Dar Al Awadi Complex
The elevators serve three areas of the complex designated as High Tower, Low Tower and Mall
The High Tower has three elevators, with a speed 240 m/min and 1,600 kg capacity, the Low Tower is served by three lifts with a speed of 150 m/min and 1,600 kg capacity while the Mall area has four elevators with a speed of 60 m/min. Access within the mall area is also facilitated by the eight escalators
This equipment meets the design and specifications set by the consultant/client, says a spokesman for Ahmadiah - Elevator Division
Ahmadiah - Elevator Division has also supplied a highly sophisticated facade cleaning system from Manntech Facade Equipment, Germany, for the project, he adds
"Hitachi and Manntech were selected by the owner/consultant, taking into consideration the quality, performance and after-sales service provided by the Ahmadiah - Elevator Division," says the spokesman. "The client entrusted our Elevator Division with the project because of its prompt response in meeting maintenance requirements and its professional approach on sales and installation