AccessMyLibrary provides FREE access to over 30 million articles from top publications available through your library.

IIE Transactions articles from May 2003

1,542 total articles

This journal publishes original research in the industrial engineering industry, focusing on design and manufacturing, operations and engineering, quality and reliability engineering and scheduling and logistics.

Set up an RSS feed
Close Set up an RSS feed that alerts you when new articles from IIE Transactions are available.
XML Add to My Yahoo! Add to My AOL Add to Google Subscribe in NewsGator
Frequently asked questions about RSS feeds
to find out when new articles for IIE Transactions arrive.

IIE Transactions archives from May 2003

On assemble-to-order systems with flexible customers.
May 1, 2003... 1. Introduction Assemble-to-order is a manufacturing strategy where parts and sub-assemblies are produced-to-stock, while the final assembly of products is delayed until customer orders have been received. Customer orders may require the...

Total WIP and WIP mix for a CONWIP controlled job shop.(Work-In-Process, pull control work-in-progress)
May 1, 2003... 1. Introduction By specifying the number of production authorizations (kanbans) in circulation on a manufacturing shop floor, pull control policies establish an upper bound for the Work-In-Process (WIP) since a fixed number of parts is...

Optimal and heuristic algorithms for the multi-location dynamic transshipment problem with fixed transshipment costs.
May 1, 2003... 1. Introduction and literature review Centrally controlled multi-location systems are capable of increasing their profitability through coordination. In recent years, organizations have started using novel logistic strategies such as...

A time-window sliding procedure for driver-task assignment with random service times.
May 1, 2003... 1. Introduction This paper addresses the problem of assigning drivers to cover a set of tasks that represent short-haul in-land container movements. The research is motivated by the drayage problem in Hong Kong, a city that handled over 16...

Capacitated, finish-to-order production planning with customer ordering day assignments.
May 1, 2003... 1. Introduction Companies that offer a large product variety from a single facility to geographically dispersed, time-sensitive customers often hold large amounts of inventory. Such companies can benefit from a finish-to-order strategy...

Sequencing on two-stage hybrid flowshops with uniform machines to minimize makespan.
May 1, 2003... 1. Introduction We define the problem of concern to us as follows. Let J denote the set of jobs, /J/ = n, all ready for processing at the same time. Each job j [member of] J consists of two tasks which are identified as (j,1) and (j, 2)....

A problem space algorithm for single machine weighted tardiness problems.
May 1, 2003... 1. Introduction In this paper we develop a Problem Space Genetic Algorithm (PSGA) for the single machine total weighted tardiness problem, 1 //[SIGMA] [w.sub.j] [T.sub.j]. The results are quite encouraging relative to the best algorithm in...

©2009 Gale, a part of Cengage Learning. All rights reserved.
About us | FAQs | Contact us | Privacy policy | Terms and conditions
Other Gale sites: Encyclopedia.com | HighBeam Research | Acquire Content | Books & Authors | Goliath | MovieRetriever | Smart QandA